Selected Mediations
AVIATION
-
$8 million 4-party Kansas - medical rescue helicopter crash with 4 casualties
CONSTRUCTION
-
$57 million 55-party California - severe structural damage caused by subsidence conditions
-
$42 million 60-party California - 2,000 home suit, multiple defects, incl. soils & foundation issues
-
$6.2 million 68-party California -186 private homes involving primarily water intrusion & structural issues
-
$6 million 22-party California - 663 apartment units damaged by water intrusion
-
$6 million 35-party Maryland - 450 townhomes design errors/omissions involving roofs
-
$5.4 million 30-party California - seaside condos constructed on poorly compacted soil
-
$5 million 46-party California - incorrect waterproofing, tiling & roofing slopes resulting in poor drainage
-
$5 million 45-party California - defective buttress caused cracked slabs in luxury homes
-
$3.5 million 22-party California - roof and skylight leaks in 250 condo units
-
$1.7 million 5-party N. Jersey – 3rd pty. damage, flood/drainage problems due to nearby highway project
-
$1.5 million 6-party Louisiana - poorly engineered curtain wall and tower
-
$1.5 million 2-party N. Jersey - warehouse construction delayed by engineering issues
-
$1.4 million 5-party California - multiple structure failures caused by addition of rock roof
-
$1.3 million 6-party Hawaii - failed parking deck over commercial space
-
$1.2 million 5-party New York - extensive damage to historic church located near excavation site
-
$900,000 18-party California - water intrus./extensive cracking of concrete floor surface &topping slab
-
$960,000 55-party California - subsurface & surface water issues causing rusting in 120 units
-
$800,000 8-party New York - defective roofs on six hospital structures
-
$750,000 6-party N. Jersey – Liquidated damages in municipal project
-
$750,000 12-party California -127 unit com. high-rise affected by roof & window related H2O intrusion
-
$637,000 28-party California - structural, electrical and HVAC issues
-
$600,000 5-party New York - faulty curtain walls on commercial building
-
$500,000 5-party Rhode I. - defective design and installation of decorative facia
-
$170,000 4-party Arizona - site conditions altered during trenching operation
SUBTERRANEAN CONSTRUCTION
-
$4.5 million 3-party N. Jersey - 300 foot shaft excav. blow-out during slurry wall construct, causing
subsidence in adjacent housing and subway lines were jeopardized
-
$4 million 3-party New York – dispute re: changed site condition clause in sewer excavation project
-
$3.5 million 4-party Michigan - construction delay due to changed site conditions
-
$3 million 6-party New York - unseasonable rains & spec. deviation in sewer excav. caused bldg collapse
-
$2 million 13-party California - failure of subterranean concrete slabs due to tar seeps subsurface
groundwater pressure in 168 unit apartment complex
BUSINESS
-
$2 million 2-party New York - failure to secure building permits prior to zone changes
-
$1.3 million 2-party Arizona - alleged conspiracy to eliminate minority distributor by micro-chip Co.
-
$500,000 4-party California - water access rights, property damage, crop failures
-
$400,000 3-party California - failure of seller to disclose foundation cracks
-
$350,000 2-party Florida - dissolved partnership dispute over distribution of losses and equity
-
$100,000 2-party California - default on promissory note
ENVIRONMENTAL
-
$4 million 3-party New York - hydroelectric plant dispute over water rights
-
$3 million 6-party Colorado - community contaminated by mobile incinerator equipment
-
$1.5 million 2-party California - condos built on former toxic waste dump
-
$1 million 25-party Pennsyl - condos built on former military toxic waste dump
-
$1 million 10-party Wyoming - contaminated site left by planting business
-
$555,000 4-party New York - subsidence problems with sanitary landfill
EMPLOYMENT DISCRIMINATION, LABOR/MANAGEMENT
-
$500,000 2-party Massachusets - minority interest shareholder fired in leveraged takeover
-
$208,000 2-party Minnesota - tri-lingual personnel director fired by hotel
-
$175,000 2-party California - sex discrimination based on hostile work environment & retaliatory
termination - (mediated in Spanish)
-
$145,000 2-party Georgia - racial bias in firing of minority manager
-
$30,000 2-party California - employer and union dispute RE: employee sick leave
-
$1.2 million 2-party NYC. - workman’s compensation for Fast Track renovation
INSURANCE COVERAGE
-
$15 million 150-party New Mexico - coverage denied in flood plain case
-
$9 million 14-party Ohio - developers/contractors denied coverage in subsidence case
-
$2 million 14-party California - seven carrier dispute over RV park construction coverage
-
$800,000 4-party Texas - developers/contractors denied general liability coverage for condo project
-
$450,000 7-party California - insurance coverage denied for defective home renovation
PERSONAL INJURY/WRONGFUL DEATH
-
$4.5 million 8-party New York - 3 persons injured and 1 killed by inebriated driver
-
$4 million 6-party New York - worker killed during construction trenching operations
-
$1.5 million 6-party New York - worker electrocuted while installing fire insulation
-
$250,000 6-party New York - personal injury at construction site
-
$165,000 2-party New York - woman injured on bank's poorly installed carpet
-
$45,000 3-party New York - construction worker injured while loading debris box
PROFESSIONAL MALPRACTICE/WRONGFUL DEATH
-
$2 million 4-party Louisiana - farm labor boss filed suit involving 3 law firms for alleged malpractice
-
$1.5 million 5-party California -wrongful death due to alleged physician/pharmacy error
PRODUCT LIABILITY
-
$4 million 4-party New York - serious P. injury from defective lawn tractor fire
-
$3 million 2-party California - failure of turbines in municipal hydro-electric plant
-
$3 million 2-party S. Carolina - alleged defects in custom manufactured packaging equipment
-
$2 million 2-party Maine - alleged equipment failure in state emergency radio system
-
$750,000 2-party Michigan - alleged defects in inter-mobile communications radios
-
$700,000 2-party Illinois - alleged product failure of shrink wrap equipment
-
$500,000 3-party Illinois - business losses allegedly attributable to faulty manufacturing equipment
Medical Malpractice
-
$2 million 3-party Connect. - Dispute re: the severity of P.I. arising from Operating Theater Failure
MEXICO PARTNERSHIP DISSOLUTION
-
70 million 4 party Mexico - 4 Sibling dispute over equity positions re: 5 distinct manufacturing plants &
family’s multiple Real Estate holdings in four separate countries